{"id":23821,"date":"2026-03-23T22:11:27","date_gmt":"2026-03-24T05:11:27","guid":{"rendered":"https:\/\/www.fictiv.com\/?post_type=cpt_help&#038;p=23821"},"modified":"2026-03-23T22:36:48","modified_gmt":"2026-03-24T05:36:48","slug":"2372639-inspection-reports-and-certificates-of-conformance","status":"publish","type":"cpt_help","link":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance","title":{"rendered":"Inspection reports and certificates of conformance"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">Certificate and inspection request protocol, cost, and potential lead time impact<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. <strong>If you have specific requirements, please speak with your Account Executive <em>prior <\/em>to placing your order as they may impact the lead time and come at an additional cost. All inspection and certificate requests must be called out in a drawing.\u00a0<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Certificate of Conformance (CoC)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This document certifies a part was manufactured to the exact specifications and requirements called out in the drawing. Fictiv can furnish a certificate of conformance (CoC) at your request for an additional $100 and it must be called out in a drawing, as well. If a certificate of conformance is requested prior to ordering, it will not impact the lead time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">First Article Inspection (FAI)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">First articles are the first units in a mass-produced production run. This early stage inspection is designed to demonstrate whether the production staff have understood and incorporated your requirements before a product reaches later stages of mass-production. If the production processes, parts, and materials used meet your requirements, the parts should be able to be reliably mass-produced to your standards. Because each customer\u2019s definition of a first article inspection can vary greatly, please speak with your Account Executive to learn more about pricing and additional lead time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">CMM Inspection Report<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">CMM stands for Coordinate Measuring Machine. This device precisely measures the geometry of a physical object using a surface probe. CMM reports are costly and the cost is calculated on a per-part basis. A CMM report request must be called out in a drawing and it can add 3-5 business days to the lead time.\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Material Certificate<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A material certificate may not be available for all materials. If one is requested, Fictiv\u2019s manufacturing partner will try to find a supplier that can provide a material certificate, however, the ability to furnish one is not guaranteed. If it\u2019s possible to obtain one, the cost will depend on the material, and sourcing difficulty may impact the lead time. This request <em>must<\/em> be submitted prior to placing your order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Please note <\/em><\/strong><em>if you submit your RFQ that includes certificate and\/or inspection callouts in a drawing without a prior discussion with your Account Executive, the quote will not reflect the cost of the certificate\/inspection or the potential additional lead time.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time [&hellip;]<\/p>\n","protected":false},"author":135,"featured_media":0,"parent":0,"menu_order":0,"template":"","categories":[295],"coauthors":[148],"class_list":["post-23821","cpt_help","type-cpt_help","status-publish","hentry","category-fictiv-teams"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Team Fictiv\"\/>\n\t<meta name=\"google-site-verification\" content=\"8ph8WlncDAsdIAhs3oF8lSgRZYdkAFVJd_q_uOqTeh0\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Fictiv\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Inspection reports and certificates of conformance - Fictiv\" \/>\n\t\t<meta property=\"og:description\" content=\"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-24T05:11:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-24T05:36:48+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Inspection reports and certificates of conformance - Fictiv\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"Team Fictiv\" \/>\n\t\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fictiv.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/#listItem\",\"name\":\"Fictiv Teams\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/#listItem\",\"position\":2,\"name\":\"Fictiv Teams\",\"item\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#listItem\",\"name\":\"Inspection reports and certificates of conformance\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#listItem\",\"position\":3,\"name\":\"Inspection reports and certificates of conformance\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/#listItem\",\"name\":\"Fictiv Teams\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/#organization\",\"name\":\"Fictiv\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Fictiv-Logo-Green-1.png\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance\\\/#organizationLogo\",\"width\":1284,\"height\":678},\"image\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/authors\\\/team-fictiv#author\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/authors\\\/team-fictiv\",\"name\":\"Team Fictiv\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#authorImage\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/T-SgWf1i-120x120.png\",\"width\":96,\"height\":96,\"caption\":\"Team Fictiv\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#webpage\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance\",\"name\":\"Inspection reports and certificates of conformance - Fictiv\",\"description\":\"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/help\\\/fictiv-teams\\\/2372639-inspection-reports-and-certificates-of-conformance#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/authors\\\/team-fictiv#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/authors\\\/team-fictiv#author\"},\"datePublished\":\"2026-03-23T22:11:27-07:00\",\"dateModified\":\"2026-03-23T22:36:48-07:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/#website\",\"url\":\"https:\\\/\\\/www.fictiv.com\\\/\",\"name\":\"Fictiv\",\"description\":\"On-Demand Manufacturing, CNC Machining & 3D Printing\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fictiv.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Inspection reports and certificates of conformance - Fictiv<\/title>\n\n","aioseo_head_json":{"title":"Inspection reports and certificates of conformance - Fictiv","description":"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time","canonical_url":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"8ph8WlncDAsdIAhs3oF8lSgRZYdkAFVJd_q_uOqTeh0","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.fictiv.com#listItem","position":1,"name":"Home","item":"https:\/\/www.fictiv.com","nextItem":{"@type":"ListItem","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/#listItem","name":"Fictiv Teams"}},{"@type":"ListItem","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/#listItem","position":2,"name":"Fictiv Teams","item":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#listItem","name":"Inspection reports and certificates of conformance"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.fictiv.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#listItem","position":3,"name":"Inspection reports and certificates of conformance","previousItem":{"@type":"ListItem","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/#listItem","name":"Fictiv Teams"}}]},{"@type":"Organization","@id":"https:\/\/www.fictiv.com\/#organization","name":"Fictiv","url":"https:\/\/www.fictiv.com\/","logo":{"@type":"ImageObject","url":"https:\/\/www.fictiv.com\/wp-content\/uploads\/2020\/09\/Fictiv-Logo-Green-1.png","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance\/#organizationLogo","width":1284,"height":678},"image":{"@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.fictiv.com\/authors\/team-fictiv#author","url":"https:\/\/www.fictiv.com\/authors\/team-fictiv","name":"Team Fictiv","image":{"@type":"ImageObject","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#authorImage","url":"https:\/\/www.fictiv.com\/wp-content\/uploads\/2021\/01\/T-SgWf1i-120x120.png","width":96,"height":96,"caption":"Team Fictiv"}},{"@type":"WebPage","@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#webpage","url":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance","name":"Inspection reports and certificates of conformance - Fictiv","description":"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.fictiv.com\/#website"},"breadcrumb":{"@id":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance#breadcrumblist"},"author":{"@id":"https:\/\/www.fictiv.com\/authors\/team-fictiv#author"},"creator":{"@id":"https:\/\/www.fictiv.com\/authors\/team-fictiv#author"},"datePublished":"2026-03-23T22:11:27-07:00","dateModified":"2026-03-23T22:36:48-07:00"},{"@type":"WebSite","@id":"https:\/\/www.fictiv.com\/#website","url":"https:\/\/www.fictiv.com\/","name":"Fictiv","description":"On-Demand Manufacturing, CNC Machining & 3D Printing","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.fictiv.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"Fictiv","og:type":"article","og:title":"Inspection reports and certificates of conformance - Fictiv","og:description":"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time","og:url":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance","og:image":"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg","og:image:secure_url":"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg","article:published_time":"2026-03-24T05:11:27+00:00","article:modified_time":"2026-03-24T05:36:48+00:00","twitter:card":"summary_large_image","twitter:title":"Inspection reports and certificates of conformance - Fictiv","twitter:description":"Certificate and inspection request protocol, cost, and potential lead time impact We are happy to help our customers in any way we can including furnishing specific certificates and inspection reports upon request. If you have specific requirements, please speak with your Account Executive prior to placing your order as they may impact the lead time","twitter:image":"https:\/\/www.fictiv.com\/wp-content\/uploads\/2025\/03\/fictiv.jpg","twitter:label1":"Written by","twitter:data1":"Team Fictiv","twitter:label2":"Est. reading time","twitter:data2":"2 minutes"},"aioseo_meta_data":{"post_id":"23821","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-03-24 05:58:44","breadcrumb_settings":null,"limit_modified_date":false,"reviewed_by":"0","open_ai":null,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-03-24 05:07:36","updated":"2026-03-24 06:01:44","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.fictiv.com\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.fictiv.com\/help\/fictiv-teams\/\" title=\"Fictiv Teams\">Fictiv Teams<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tInspection reports and certificates of conformance\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.fictiv.com"},{"label":"Fictiv Teams","link":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/"},{"label":"Inspection reports and certificates of conformance","link":"https:\/\/www.fictiv.com\/help\/fictiv-teams\/2372639-inspection-reports-and-certificates-of-conformance"}],"_links":{"self":[{"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/help\/23821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/help"}],"about":[{"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/types\/cpt_help"}],"author":[{"embeddable":true,"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/users\/135"}],"wp:attachment":[{"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/media?parent=23821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/categories?post=23821"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.fictiv.com\/wp-json\/wp\/v2\/coauthors?post=23821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}